Nissan Rogue Service Manual: Oil pan and oil strainer
Exploded View
- Oil pan, upper
- Oil filter
- Front cover
- O-ring
- Oil strainer
- Oil pan, lower
- Washer
- Drain plug
- O-ring
- Oil level gauge guide
- Oil level gauge
- Rear cover plate
- To Oil pan, lower
Removal and Installation
REMOVAL
WARNING:
To avoid danger of being scalded, do not drain engine oil when engine is hot.
- Drain engine oil. Refer to LU-8, "Draining".
- Remove the oil filter. Refer to LU-10, "Removal and Installation".
- Remove fender protector (RH). Refer to EXT-28, "FENDER PROTECTOR :
Removal and Installation".
- Remove the front driveshaft (RH). Refer to FAX-20, "Removal and
Installation (RH)".
- Remove the front exhaust tube and gaskets. Refer to EX-5,
"Exploded View".
- Remove bolt (A) securing oil level gauge (2).
- Remove oil level gauge (1), oil level gauge guide (2), and O-ring
(3).
- Remove the power steering gear bolts and support the power steering
gear. Refer to ST-14, "Removal
and Installation".
- Remove the rear engine mount torque rod bracket. Refer to EM-81,
"Exploded View".
- . Remove the front suspension member for clearance to remove the oil
pan. Refer to FSU-20, "Removal
and Installation".
- On models equipped with AWD, remove transfer assembly. Refer to
DLN-70, "Removal and Installation".
- Disconnect the A/C compressor harness connector.
- Remove the A/C compressor bolts, position the A/C compressor aside
and support. Refer to HA-30,
"Removal and Installation".
- Remove the lower oil pan bolts in the reverse order as shown.
- Remove the lower oil pan using Tool (A).
CAUTION:
Be careful not to damage the mating surfaces.
NOTE:
In areas where the cutter is difficult to use, use a plastic hammer
to lightly tap (1) the cutter where the liquid gasket is applied. Use
a plastic hammer to slide (2) the cutter by tapping on the side.
Tool number : KV10111100 (J-37228)
- Remove the oil strainer bolts in the reverse order as shown then
remove the oil strainer.
- Remove rear cover plate and engine-to transaxle bolts.
- Loosen the upper oil pan bolts in the order shown.
- Remove upper oil pan using Tool (A).
- Remove the three O-rings from the upper oil pan and front
cover.
CAUTION:
Be careful not to damage the mating surfaces.
NOTE:
In areas where the cutter is difficult to use, use a plastic hammer
to lightly tap (1) the cutter where the liquid gasket is applied. Use
a plastic hammer to slide (2) the cutter by tapping on the side.
Tool number : KV10111100 (J-37228)
INSPECTION AFTER REMOVAL
Clean the oil strainer screen to remove any foreign material.
INSTALLATION
- Apply Genuine Silicone RTV Sealant or equivalent to the upper
oil pan at the specified sealant bead diameter (A) as shown.
Refer to GI-22, "Recommended Chemical Products and Sealants".
Sealant bead
diameter (A)
: 4.0 - 5.0 mm (0.157 - 0.197 in)
CAUTION:
- Be sure liquid gasket application surface is free from
dust, grease, and water.
- Install two new O-rings in the upper oil pan and a new Oring
in the front cover.
- Do not reuse O-rings.
- Be sure to apply liquid gasket to the outside of bolt holes 1,
2, and 4.
- Be sure to apply liquid gasket without breaks or overlap.
- Installation should be done within 5 minutes after applying
liquid gasket.
- Do not fill the engine with engine oil for at least 30 minutes
after the components are installed to
allow the liquid gasket to cure.
- Install the upper oil pan to the block and tighten the upper oil pan
bolts to specification in the order shown.
CAUTION:
Install upper oil pan bolts in the same position from which
they were removed.
All bolts except 18 and 19 : 21.6 N·m (2.2 kg-m, 16 ft-lb)
Bolts 18 and 19 : 8.8 N·m (0.90 kg-m, 78 in-lb)
- Apply Genuine Silicone RTV Sealant or equivalent to the lower
oil pan at the specified sealant bead diameter (A) as shown.
Refer to GI-22, "Recommended Chemical Products and Sealants".
CAUTION:
- Be sure liquid gasket application surface is free from
dust, grease, and water.
- Be sure to apply liquid gasket to the inside of all bolt
holes.
- Be sure to apply liquid gasket without breaks or overlap.
- Installation should be done within 5 minutes after applying
liquid gasket.
- Do not fill the engine with engine oil for at least 30 minutes
after the components are installed to
allow the liquid gasket to cure.
Sealant bead
diameter (A)
: 4.0 - 5.0 mm (0.157 - 0.197 in)
- Install the lower oil pan to the upper oil pan and tighten the
lower
oil pan bolts to specification in the numerical order shown.
- Install oil level gauge (1), oil level gauge guide (2), and O-ring
(3).
Bolt (A) : 21.6 N·m (2.2 kg-m, 16 ft-lb)
- Installation of the remaining components is in the reverse order of
removal.
INSPECTION AFTER INSTALLATION
Check for engine oil leaks with the engine at operating temperature and
running at idle. Refer to LU-7,
"Inspection".
Exploded View
Cylinder head
Exhaust manifold and three way
catalyst gasket
Exhaust manifold cover (upper)
Exhaust manifold and three way catalyst
Exhaust manifold ...
Exploded View
Ignition coil
Spark plug
Rocker cover
Removal and Installation
REMOVAL
Remove air duct assembly. Refer to EM-24, "Exploded View" .
Dis ...
Other materials:
System description
DESCRIPTION
Engine Cooling System
Thermostat
Water outlet
Cylinder block (Thermostat housing)
Water inlet
Radiator
Water pump
Cylinder block
Cylinder head
Open
Closed
To electric throttle control actuator
To oil cooler
...
Steering switch
Description
When one of the steering switches is pushed, the resistance in the steering
switch changes the signal to
identify which button is controlling the information display.
Diagnosis Procedure
Regarding Wiring Diagram information, refer to MWI-32, "Wiring Diagram".
1.CHECK STE ...
Service data and specifications (sds)
Idle Speed
Condition
Specification
No load* (in P or N position)
650 ± 50 rpm
*: Under the following conditions
A/C switch: OFF
Electric load: OFF (Lights, heater fan & rear window defogger)
Steering wheel: Kept in straight-ahead position
...
© 2014-2024 Copyright www.nirogue.com