Diagnosis Procedure
1.PERFORM INITIALIZATION PROCEDURE
Initialization procedure is executed and operation is confirmed.
Refer to PWC-27, "ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL : Special Repair Requirement".
Is the inspection result normal? YES >> Inspection End.
NO >> GO TO 2.
2.CHECK ENCODER CIRCUIT
Check encoder circuit.
Refer to PWC-45, "Component Function Check".
Is the inspection result normal? YES >> GO TO 3.
NO >> Repair or replace the malfunctioning parts.
3.CONFIRM THE OPERATION
Confirm the operation again.
Is the result normal? YES >> Check intermittent incident. Refer to GI-41, "Intermittent Incident".
NO >> GO TO 1.
Replacement operations
Description
This section is prepared for technicians who have attained a high level
of skill and experience in repairing
collision-damaged vehicles and also use modern service tools and equipment.
Persons unfamiliar with body
repair techniques should not attempt to repair collision-dam ...
Rear wiper and washer system
Wiring Diagram
...
Oil pump
Exploded View
Front cover (Oil pump body united)
Outer rotor
Inner rotor
Oil pump cover
Regulator valve
Regulator valve spring
Regulator valve plug
CAUTION:
Before assembly, apply new engine oil to the parts as shown above.
Removal and Installation
REM ...